Job Site Requirements for PermEntry®

Minimum Work Area for PermEntry and Stairwell

PermEntry Job Requirements

1. Width of opening in foundation wall should be 40" maximum for all types.

2. When foundation is back-filled, leave minimum work area for PermEntry® installation as shown.

3. Ensure proper soil drainage at base of unit - recommend exterior drain tile to daylight.



Diagram - PermEntry
File Size: 154 kb
File Type: pdf
Download File

For 9' Basement Wall

PermEntry Job Requirements

If your footing to the outside grade height is greater than 84", you will need to pour the extension T.
Contact us for more information.

PermEntry Sideview
PermEntry Sideview


How to Order

PermEntry
1. Determine the height of foundation wall from top of footing.

2. Determine dimension from proposed finished grade to top of foundation wall.

3. Back fill base of casting with 1 ft of gravel and rest with dirt.

4. Refer to types available and select size to assure top of PermEntry® stairwell will be 2" to 6" above finished grade.



We offer the Complete Basement Entry Package including:
Excavation, Wall Cutting, PermEntry® or SCAPEWEL® Installation, and Back-filling the area. Contact us for more information.